410 Church ST Parramatta

 

Potential savings of 194MWh (or $46,000) per year

 

Common service energy bills fell by $2500-$3000 per month

 
 

Project Overview

  • 6-storey strata plan office building

  • restaurant

  • 2-level car park

We analysed meter data in conjunction with electricity bills before conducting a complete site inspection to assess energy-using plant & equipment. They then established an end-user equipment energy breakdown and identified several key Energy Conservation Measures (ECM).

The energy audit identified potential savings of 194MWh (or $46,000) per year, with almost one-third having a simple payback of only 9 months. Energy Conservation assisted to change network tariff and install control systems for HVAC supply & cooling tower fans, electric hot water systems, lighting and power factor correction.

With many of the proposed ECM implemented, common service energy bills fell by $2500-$3000 per month. Energy Conservation is assisting to re-design the HVAC system through modelling by whole-building simulation.

IMG_8717.JPG